Thursday, July 7, 2016

Phases plan

This past week I was encharged of working in a new idea, a plan divided in phases.
The objective of the phases plan is to focus to build the actual track separately. In phase one we would accomplish our first objective that is connect the two campus.

In phase 2, the idea is to expand the network to attend most of the population living downtown between the campuses.
And finally phase 3 would link the network to points of interest:


Route to San Jose airport.
Route to Tamien station and grocery store (walmart showed as an example).


Route passing through future student housing.
 I also wanted to post a sketch that shows the length of a ground floor station that starts going down over the street (traffic lights would be needed) in order to save some space in the sidewalks.



I'm not an expert on CAD, but I think this simple drawing can give an idea of how an station would occupy space of the sidewalk if it is ground floor.


















No comments:

Post a Comment